Home About Us

Engineering Excellence. Enduring Solutions.

Founder-owned since 2017. Nine years, four countries, one accountable delivery team.

Our Story

Nine Years, One Line at a Time

EMRIX began in 2017 as four engineers with a rented workshop and one control-panel retrofit for a regional process plant. The shape of the company since then has been set less by strategy than by clients asking us to come back for the next thing.

Nine years later we run our own switchgear assembly, an instrumentation stock holding, and service teams in Germany, Australia, Egypt and Pakistan — within reach of most plants we look after. The senior core team is still on site regularly — that was never a phase.

Who We Work With

Cement and minerals producers, power generators, oil & gas operators, water utilities, chemical and pharmaceutical plants, and the EPC contractors who build for them. Some engagements are a single retrofitted line; others are a decade-long relationship across a whole site.

How We Stay Maintainable

Vendor-neutral technology choices, house standards for code and drawings, genuine spares held in stock, and handover packs written for the next person — so the plant stays serviceable long after our team has driven home.

Our Mission

“Control systems that tell the truth about what is happening in a plant, and respond the way the people running them expect.”

Our Vision

A smart industry that stays humane: plants understood remotely, diagnosed early and fixed quickly — without asking operators to become data scientists.

What We Believe

Our Core Values

01

Commitment

We finish what we start, including the unglamorous last five percent.

02

Integrity

Honest scopes, honest timelines, honest bad news early.

03

Quality

Good workmanship inside the panel, not just on the drawing.

04

Teamwork

One team with the client's team — no throwing work over walls.

05

Respect

Operators know their plant. We listen before we redesign.

06

Safety

No delivery date is worth a shortcut around a safety case.

Milestones

Company History

Each step below came from a client request we could not answer with what we had at the time.

2017

Founded in Germany

Engineering team formed in North Rhine-Westphalia; first control-panel retrofit delivered.

2018

Panel Shop & SCADA Practice

In-house switchgear assembly opens; first plant-wide SCADA delivered end to end.

2019

ISO 9001 & First Export Project

Quality system certified; commissioning team travels to its first overseas site.

2020

Remote Diagnostics Pilot

Secure remote access piloted on a handful of sites during global travel restrictions — the groundwork for the practice standardised in 2022.

2021

Instrumentation Supply Division

Stockist and importer agreements signed; measuring instruments held in Germany.

2022

Secure Remote Commissioning

The remote-access and diagnostics practice now standard on every job.

2023

Panel Shop Capacity Expanded

A second production line opened in Hürth to meet rising demand ahead of opening regional offices the following year.

2024

Regional Offices Open

Engineers based closer to clients in Australia, Egypt and Pakistan.

2026

Four Countries, One Delivery Team

Automation, instrumentation, panels and digital under one roof.

Want to Work With Us?

Tell us which plant, which line, and what's bothering you about it.

Contact Us